Alert: The Plaza Building will remain closed through Jan. 1, 2025.

Learn More

Resources and Activities

Whether you’re looking for in-depth guides, interactive tools, or quick video tips, our library has something for everyone.

A construction truck carries a webpage to a screen that says Hola and Hello.

La traducción al español de esta página está en desarrollo. Consúltela más adelante.

Center for Inclusive Design and Engineering (CIDE)

CU Denver

The Hub, Bioengineering

1224 5th Street

Suite 130

Denver, CO 80204


303-315-1280

CMS Login