Fitzsimons Building (FKA B500) – Replace Electrical Switch Gear


Project Overview

Replacement of existing electrical load centers serving the Fitzsimons Building (formerly known as B500). This state-funded controlled maintenance project is being designed and constructed in multiple phases to systematically replace all three (3) load centers, including medium voltage primary switches, 13.2 KV - 480/277V transformers and low voltage switchboards. The new equipment enclosures will be NEMA 3R for exterior exposure and integrated on pre-fabricated structural steel skids to minimize replacement time. 

Project Manager

Robert Holzwarth – Facilities Management Projects

303-724-0749

 robert.holzwarth@cuanschutz.edu

Construction Manager/General Contractor:

Howell Construction

Electrical Subcontractor:

Intermountain Electric (IME)

Project Cost

$2.3 Million

Project Completion

All phases of electrical equipment installation and related construction work are scheduled for completion by first quarter 2020.

Project Schedule

Design:  

December 2017 to November 2018

Construction:

January 2020 thru April 2020

Outage Details:

​ Planned           Outage        1-17-20 5PM            T0          1-19-20  5PM.pdfPlanned Outage 1-17-20 5PM T0 1-19-20 5PM.pdf