1. Old logos uploaded on top of new logos on staging.
2. Verify that all old logos have been overwritten.
3. Test each logo - verify using existing spreadsheet.
4. Check-in/Publish all new logos.
5. Reassign to Scott
6. Repeat on production for actual push