Fitzsimons Building Upgrades to HVAC VAV


Project Overview

Install new HVAC systems on various floors in the Fitzsimons Building on the Anschutz Medical Campus to achieve a standard layout allowing for modern, energy efficient temperature control. The new system will be VAV-distribution (variable air volume) with hot water reheat for better temperature control. New Siemens building automation control will be installed with the new distribution system. To enhance the controls system, occupancy sensors are also included which will drive both lighting and HVAC unoccupied set-back control. Testing, adjusting, and balancing of system air/water flow-rates needed to confirm operation.  


 

Project Manager

Dan Argersinger – Facilities Management Projects daniel.argersiner@ucdenver.edu


 

Project Architect/ Engineer

RMH Group
 

General Contractor

TBD


Gross Square Footage

223,414 

 

Project Cost

$3,693,173

 

Project Completion

April 2020

 

Project Schedule 

Design:  March 2019 - August 2019
Construction:  August 2019 – March 2020


 